Application note: Fast fabrication feedback for manufacturing of superconducting thin-films
Details critical temperature measurement of a superconducting thin-film completed in less than five hours, including sample preparation and loading, cryostat cooldown, measurement of the resistance at different temperatures and cryostat warm-up.
Please submit your details and you will be redirected to the download page.