Product feature
Inside kiutra.io – load samples in minutes, not days
Prepare the next sample while the current one is still cold. Electrical connections are up minutes after loading, so a dead device shows before the cooldown rather than after it.
Most cryogenic labs move at a snail’s pace. A single sample exchange can take a full day.
Our systems change that. The puck-based workflow and automated sample handling with kiutra.io make cryostat access efficient, repeatable and fast.
Prepare your next sample while your current experiment is running. Load and cool down in just minutes. Never waste a cooldown: With electrical connections established just minutes after loading, you’ll know right away if your device is still functional.
This is how we support high throughput testing and feedback in quantum and materials R&D.
See the loading process in action.